Wild Eats Braided Paddywack
Find In Stores
Wild Eats Braided Paddywack
Description
Wild Eats® Water Buffalo Braided Paddywack is made from natural water buffalo neck meat. We use only small-scale farm sustainably sourced free-range & grass-fed Water Buffalo for the highest quality chew. These Paddywack chews are high in protein while remaining low in fat, satisfying a K9's natural cravings. The natural texture helps to clean teeth & gums as a pet chews, which aids in overall dental health. Water buffalo horns are a long-lasting chew and are perfect to keep even the toughest chewers occupied. Non splintering & nonabrasive with no additives or preservatives.
Details
BRAIDED PADDYWACK / 6"
- Dimensions: 3.450X3.100X1.850
- Product Weight: 0.28 lb
BRAIDED PADDYWACK / 9"
- Dimensions: 9.300X1.950X2.000
- Product Weight: 0.47 lb